posted in:

Vietnam rejects Posco steel mill project: reports

Monday, Nov 17, 2008

Vietnam has rejected a proposal by South Korea's Posco Group to build a 5.4-billion-dollar steel mill near a coastal resort, citing environmental concerns, state media reported on Friday.

The hot-rolled steel mill proposed for south-central Nha Trang's Van Phong Bay would have breached environmental protection rules, said a decision from Prime Minister Nguyen Tan Dung, according to the Tien Phong (Pioneer) daily.

The newspaper, and other media reports, said another reason the government scrapped the project was that it would have clashed with the planned development of a major container port in Van Phong Bay.

Dung asked Khanh Hoa province leaders to discuss other possible sites for the mill, according to the news website VietnamNet.

The premier, in a televised address to the national assembly on Thursday, said the communist government had ""refused a project worth 4-5 billion dollars in steel"" for environmental reasons, without naming the project.

He added that the government was determined to prevent further pollution in the country of 86 million people, where rapid industrialisation since the 1990s has caused widespread river and air contamination.

In January local authorities had given Posco and local ship builder Vinashin the green light to build the mill, including a 1,000-megawatt power plant.

But the news triggered a wave of protests in the local media, with residents and tourism operators saying it would spoil the environment in the seaside resort, where a number of new luxury hotels are now being built.

The Korean industrial giant is already building a 1.1-billion-dollar steel plant, set to start operation next year, in the southern industrial Ba Ria Vung Tau province near Vietnam's largest urban centre and port Ho Chi Minh City.

 

Source: AFP

posted in:

Other Metal News

Silver Shield updates West Timmins exploration results 29-07-2010
Augen Gold Corp. Applies for Listing of Flow-Through Warrants 29-07-2010
CORRECTION FROM SOURCE: Inter-Citic Releases Drill Hole Results From New Zone at Dachang Gold Project 28-07-2010
Batero Gold Corp. Completes Colombian Quinchia Gold Property Acquisition and $5.3 Million Financing 28-07-2010
Sama Resources Discovers New Zone of 1.93% Nickel-Copper and 1.6 GPT PGE Over 9 Metres at the Samapleu Project in Cote d'Ivoire 27-07-2010
Banro announces the arrival of its refurbished gold plant at Twangiza and provides construction update 27-07-2010
Black Hawk Exploration Announces Drill Program Start-up at Dun Glen Gold and Silver Property 26-07-2010
Alcoa Names Tony Thene CFO for Engineered Products and Solutions group; Graeme Bottger Elected Alcoa Controller 26-07-2010
Gladstone Pacific Nickel Limited (the "Company") (ACN 104 261 887) - Expired MOU with TCC 23-07-2010
Lake Shore Gold announces drill results at Casa Berardi exploration property 23-07-2010

Advertisers